CPS we offer a complete delivery service
including offloading
and positioning of equipment
in the room as well as a full battery
build including all DC
interconnecting links. This service can be provided
during normal working hours or out of hours to suit your specific
requirements, with commissioning being carried out during the same
day for smaller systems and on a return visit for larger systems.
Typically, any CPS proposal from 10kVA upwards
would include the above services, therefore please note that it is
possible that other vendors may only allow a kerbside delivery and
impose additional costs at a later stage.
In most cases we assume easy access with the
use of a suitable goods lift should this be required, however special
requirements such as stairwalking
and cranage can also
be accommodated. Please ensure that this is discussed at the quotation
stage wherever possible as we may require a site visit to provide
accurate costings.
If our External
Maintenance Bypass panel is purchased we can usually
supply this to site within one week to allow the AC cabling works
to be completed prior to the delivery of the UPS system. Alternatively,
you can leave everything to us and let CPS cater for any associated
cabling works, however
please ensure that this is discussed at the quotation stage as site
surveys are a neccesity when cabling works are required.
Longer runtimes or larger rated systems usually
require an external battery system and providing the battery is adjacent
to the UPS module and the rating does not exceed 30kVA we will include
the main DC connection
as part of our standard delivery. DC connections on remote batteries
or systems larger than 30kVA will be offered as additional works or
assumed by others.
Certified Electrical Installation Due to the close working
relationships we have with several members of the Electrical Contractors
Association (ECA) and various other associations, we can offer certified
installation of all our equipment, or simply supervise final connections
following delivery and positioning. Our electrical engineers have
undertaken many large projects for CPS incorporating combined UPS
and generator installations complete with all the necessary switchgear
and distribution panels for both new and existing systems.
Factory
Witness Testing and Onsite Load Bank Testing Witness
testing can be arranged either at our premises in Hitchin, Hertfordshire
or at our Italian manufacturing plant. This would be based on our
standard UPS demonstration and operation training.On site load bank testing and specialised testing can also
be accomodated.more> Client
Demonstration and Training CPS
can train your personnel in the operation and routine maintenance
of UPS and battery systems including the proper procedures to adopt
in the unlikely event of a system malfunction. The CPS training program
is used for our own staff and can be adapted to suit distributors,
customers and overseas engineers.
Basic training is generally conducted during or following commissioning
and can be accommodated at our factory or on site.
-------------------------------------------
10
to 80kVA
Single and three phase UPS models for medium
sized applications >
-------------------------------------------
100
to 800kVA Large
UPS models
to cater for whole floors or entire buildings >
ServiceAgreements
24-7 callout,
preventative
maintenance,
spare parts
Removal
and Disposal Services
CPS are Environment Agency registered waste producers and carriers,
and comply with all European WEEE and ROHS directives. This compliance
allows us to offer removal and disposal services in relation to
equipment upgrades or relocation of existing. Please refer to our
accreditatons
page for more details. Battery
Replacementsand Upgrades
CPS can undertake replacement battery installations based on a "like
for like" exchange or a load specific battery calculated to
be more cost effective or to make better use of available floor
space. In the present economic climate where lead price is very
volitile this re-calculation and careful selection is even more
important. CPS have close working reltionships with several battery
suppliers and can source virtually any battery block.
Battery upgrades and replacements can utilise existing racks and
cubicles or alternatively we can supply new. We ensure that all
old batteries are removed from site and safely disposed of to the
relevent regulations.