 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
_r1_c2.jpg) |
_r1_c12.jpg) |
|
|
|
 |
 |
_r2_c2.jpg) |
_r2_c3.gif) |
 |
_r3_c19.gif) |
 |
_r4_c12.jpg) |
_r4_c13.gif) |
_r4_c18.jpg) |
 |
_r5_c19.gif) |
_r5_c20.gif) |
_r5_c21.gif) |
_r5_c22.gif) |
_r5_c24.gif) |
 |
_r6_c20.gif) |
_r6_c22.gif) |
 |
_r7_c13.jpg) |
 |
_r8_c2.gif) |
_r8_c12.gif) |
_r8_c17.gif) |
_r8_c19.gif) |
_r8_c22.gif) |
_r8_c23.gif) |
_r8_c26.gif) |
_r8_c27.gif) |
 |
_r9_c3.gif) |
 |
 |
 |
| Uninterruptible
Power Supplies |
|
Installation
& Removal Services
-----------------------------------------------------------------------------------------------------------------------------------------
|
 |
| |
_r12_c4.gif) |
 |
_r13_c4.jpg) |
|
500va
to 10kVA
Comms rack and tower UPS models for small sized applications > |
|
 |
At
CPS we offer a complete delivery and
installation service
including offloading
and positioning of equipment
in the room as well as a full battery
build including all DC
interconnecting links. This service can be provided
during normal working hours or out of hours to suit your specific
requirements, with commissioning being carried out during the same
day for smaller systems and on a return visit for larger systems.
Typically, any CPS proposal from 10kVA upwards would include the above
services, therefore please note that it is possible that other vendors
may only allow a kerbside delivery and impose additional costs at
a later stage.
In most cases we assume easy access with the use of a suitable goods
lift should this be required, however special requirements such as
stairwalking and cranage
can also be accommodated. Please ensure that this is discussed at
the quotation stage wherever possible as we may require a site visit
to provide accurate costings.
If our External Maintenance Bypass
panel is purchased we can usually supply this to site within one week
to allow the AC cabling works to be completed prior to the delivery
of the UPS system. Alternatively, you can leave everything to us and
let CPS cater for any associated cabling
works, however please ensure that this is discussed
at the quotation stage as site surveys are a neccesity when cabling
works are required.
Longer runtimes or larger rated systems usually require an external
battery system and providing the battery is adjacent to the UPS module
and the rating does not exceed 30kVA we will include the main DC
connection as part of our standard installation. DC
connections on remote batteries or systems larger than 30kVA will
be offered as additional works or assumed by others.
Electrical
Installation
Due to the close working relationships we have
with several members of the Electrical Contractors Association (ECA)
and various other associations, we can offer certified installation
of all our equipment, or simply supervise final connections following
delivery and positioning. Our electrical engineers have undertaken
many large projects for CPS incorporating combined UPS and generator
installations complete with all the necessary switchgear and distribution
panels for both new and existing systems.
Witness
and Load Bank Testing
Witness testing can be
arranged either at our premises in Hitchin, Hertfordshire or at our
Italian manufacturing plant. This would be based on our standard UPS
demonstration and operation training.
On site load bank testing and specialised testing can also
be accomodated.
Client Demonstration
and Training
CPS can train
your personnel in the operation and routine maintenance of UPS and
battery systems including the proper procedures to adopt in the unlikely
event of a system malfunction. The CPS training program is used for
our own staff and can be adapted to suit distributors, customers and
overseas engineers. Basic training
is generally conducted during or following commissioning and can be
accommodated at our factory or on site. |
 |
| ------------------------------------------- |
 |
_r16_c4.gif) |
_r16_c5.jpg) |
|
10
to 80kVA
Single and three phase UPS models for medium
sized applications > |
 |
| ------------------------------------------- |
 |
_r18_c4.jpg) |
|
100
to 800kVA Large
UPS models
to cater for whole floors or entire buildings > |
 |
_r19_c4.gif) |
 |
 |
 |
_r21_c2.jpg) |
|
Service
Agreements
Spares, callout
preventative
maintenance &
'CPSWatch' > |
|
 |
 |
 |
| |
Rental
Agreements
-------------------------------------------
Installation,
Removal, Disposal
-------------------------------------------
Low
Voltage Switchgear
-------------------------------------------
Site Surveys
and Pre Sales
-------------------------------------------
Diesel
Generator Sets
-------------------------------------------
UPS
Network Monitoring |
 |
| |
Equipment
Removal and Disposal
CPS are Environment Agency registered waste producers and carriers,
and comply with all European WEEE and ROHS directives. This compliance
allows us to offer removal and disposal services in relation to equipment
upgrades or relocation of existing.
Battery Replacements
and Upgrades
CPS can undertake replacement battery installations based on a "like
for like" exchange or a load specific battery calculated to be
more cost effective or to make better use of available floor space.
In the present economic climate where lead price is very volitile
this re-calculation and careful selection is even more important.
CPS have close working reltionships with several battery suppliers
and can source virtually any battery block.
Battery upgrades and replacements can utilise existing racks and cubicles
or alternatively we can supply new. We ensure that all old batteries
are removed from site and safely disposed of to the relevent regulations. |
 |
_r25_c16.gif) |
 |
| ©
copyright cps ltd | terms
& conditions
| site by boxred.co.uk |
downloads
| contact | recruitment |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|